No pages meet the criteria

Location

Bradwell Location

Web Updates

Keep informed with the latest news and developments from the NDA

Performance Updates

Find out more about Bradwell's Performance, visit our Programme Performance Updates section.

See also

Related Documents

Site Progress Key

On target
On target
Behind target with possibility of recovery
Behind target with possibility of recovery
Behind target
Behind target

Safety and Environmental Performance Key

Nuclear Safety
No incidents this month No incidents in the month
One or more incidents in the month One or more INES Level 1 or above in the month
Industrial Safety
No incidents this month No incidents in the month
One or more incidents in the month One or more RIDDOR reportable events in the month
Environmental Safety
No incidents this month No incidents in the month
One or more incidents in the month One or more environmental non compliances in the month
.
Home > Our Sites > Bradwell  

Bradwell

Bradwell Site 

Bradwell Power Station
Bradwell-on-sea
Southminster
Essex
CM0 7HP

Tel. 01621 776331

Bradwell power station an area of 20 hectares covered by the nuclear site licence, this power station operated from 1962 until 2002 when it ceased electricity generation. Defuelling completed in 2006.

Work continues to prepare this site for entry into Care and Maintenance.

Overview

Age Operated from 1962 - 2002
Site Stakeholder Group Bradwell Site Stakeholder Group
Site Licensee Magnox Limited
Parent Body Organisation Energy Solutions Inc
Status Decommissioning and Termination
Cost - Lifetime
(total discounted nuclear liability)
£596m

 * The costs of discharging the nuclear liability will be incurred over a significant period of time. To take account of the time value of money, the costs are "discounted" back to a present value. Effectively this is the amount that would need to be invested today, at a set rate of interest (the discount rate) in order to pay for the liability in the future as it falls due.

Year Key Activities

2083 -
2092

Final site clearance

2015

Site enters Care and Maintenance phase
During this stage the reactor is left to cool. Most of the structures are removed, and the reactor building is left ina safe state which requires minimum supervision, until final site clearance.

2011

Turbine Hall deplanted and demolished

2009

Partial drain down of cooling pond

2005

Defuelled
Once a site has finished operating and the fuel has cooled down it can beremoved and taken to Sellafield for reprocessing.


Progress against this year's targets

Status as at end Quarter 3 (end December 2011) - next update due April 2012


Site Restoration

Target Status Commentary

Complete factory acceptance testing of equipment for the dissolution of Fuel Element Debris (FED)

Behind target

Testing will be complete within the current year, behind date orignally expected by the NDA. No significant impact on the overall programme.

Complete deplanting of the first reactor pile cap charge machine and progress dismantling of reactor pile caps

On target

On track

Complete emptying of active waste vaults 3a and 3b

On target

On track

Completion of pond decontamination

On target

Complete

Radioactive Waste Management Directorate (RWMD) - Interim Letter of Comlpiance (LoC) issued for Bradwell waste streams for Mini-Stores

On target

Complete

Turbine Hall deplanted and demolished

On target

Complete


Safety and Environmental Performance

Status as at end Quarter 3 (end December 2011) - next update due April 2012

Nuclear Safety
Industrial Safety
Environmental Safety